久久一二三四,韩国日本在线,激情天天 Installing Grafoil Crinkle Gasket Tape

国产特级-狠狠干天天爱-欧美黄色一级-日韩一级片在线观看-日韩免费高清-奇米第四色777-美女又黄又爽-国产黄色三级-激情视频免费在线观看-人人爱av-黄片毛片在线观看-欧美另类xxxx-黄色网页在线播放-色视频在线观看免费-男人的天堂中文字幕-欧美aaa大片-波多野吉衣在线视频-黄色片网站免费看-亚洲精品三-逼逼爱插插网站-爱情岛论坛亚洲品质自拍视频-亚洲色图第四色-亚洲com-人人舔人人射-а中文在线天堂-成人污污视频在线观看-朝鲜黄色一级片-日本久久色

DONDE SEAL

CHINA

Professional Of Mechanical Packing & Industrial Gasket

  Home About Us Products Technology Equipment Contact Us English Version 中文版  

How to install the gland packing?

How to cut gasket material?

How to choose spiral wound gasket?

Take a stand with your packing gland

How to install grafoil crinkle gasket tape?

Choose the right gasket

Why there is packing failure?

Spiral wound gasket production process

Graphite cut gasket

Installation and Maintenance Tips

Why Gaskets Are Used?

Installation instructions for gaskets

Effecting a Seal

Gasket Seating

Forces Acting on a Gasketed Joint

Sample Gasket Application Problem
Troubleshooting Leaking Joints
Gasket material
Mica Gasket material
Non-Asbestos Gasket Material
Methods or techniques of sheet metal working
   
   
   
   

Installing Grafoil Crinkle Gasket Tape

1. Brush off any rust or foreign particles. Wipe flange surface thoroughly with a rag soaked in acetone or other suitable solvent to remove grease or oil.

2. Insert fingernail between the paper backing strip and the tape and strip the paper back three to six inches. Draw a reference line in flange and press squared off end of tape against it.

3. Now, start laying the tape along the face of the flange, peeling the paper backing as you go. To prevent the adhesive surfaces of the tape from doubling back on themselves and sticking together, strip away only a few inches of paper at a time.

4. When the starting point has been reached, lap the tape not more than 1/16 inch and cut with a sharp blade.

5. If wrinkles appear because of improper installation, the may be rolled out with a length of pipe.

For Multiple Thickness Gasket, Add Steps 6, 7 and 8

6. When the starting point has been reached, do not cut the tape. Roll out the tape already laid down using a short length of smooth pipe to iron out the wrinkles.

7. Now, repeat step 3. Be sure that the top layer is positioned exactly above the first layer before contact is made. Once the adhesive touches the tape, it is impossible to separate the layers without tearing them.

8. Repeat steps 6 and 7, depending on the number of layers of tape to be laid down. Finish with steps 4 and 5.

>>The End>>

浙ICP備09001215   Copyright:CIXI ZONDE SEALING & GASKET CO.,LTD.
Address:Ximenwai Industrial District,Longshan Town,Cixi,Ningbo City,China.
Tel:+86-574-63787875, 63787080 Fax:+86-574-63787241 
E-mail: mgr@chinaseal.cn; wangbo@chinaseal.cn